by admin-optimum-549 | Aug 10, 2023 | Oil & Gas
As 6 trenchless crossings were successfully completed for a GRTgaz DN300 gas pipeline diversion in northern France recently, the importance of having trenchless expertise from a project’s outset was again apparent. The crossings pass under rivers, roads, a brownfield...
by admin-optimum-549 | Aug 25, 2022 | Oil & Gas
Great to have accompanied Teréga during the extensive Mont – Ogenne project in southwest France, a key step of which was completed a few days ago thanks to great teamwork and some pretty impressive equipment ! • – Two parallel 500-metre-long HDD crossings, DN650...
by admin-optimum-549 | Jul 28, 2022 | Electricity
• Persan : Six 175m – 200m long HDD crossings under rivers and the A16 Paris – Calais motorway• Noyales : Four 90m – 120m long HDD crossings under rivers and roads in arable / pasture land• Romainville : Six 85m – 110m long HDD crossings in a heavily built-up...
by admin-optimum-549 | Oct 8, 2020 | Corporate
• Echirolles : a 65 metre-long urban pipe ramming project under the Grenoble ring road• Brioude : a 140 metre-long HDD crossing to bypass new motorway construction• Albias : 3 parallel 310 metre-long HDD crossings under the rural Aveyron river Three projects, all in...