by admin-optimum-549 | Oct 11, 2019 | Oil & Gas
The dual gas pipeline crossing of the Dordogne at Cubzac is complete. By reworking the project engineering and assisting technical operations on a daily basis, OPTIMUM managed to halve both the drilling costs and the project timeframe. We are proud to have been able...