by admin-optimum-549 | Sep 7, 2020 | Corporate
Understanding the full scope of a trenchless project and propose relevant solutions at every step of the way; the exhaustive article published in the latest edition of Réseaux VRD underlines the intelligence of OPTIMUM’s involvement in the Dordogne river crossing....
by admin-optimum-549 | Jun 22, 2020 | Water
The second DN560 pipeline allowing the BRL – Aqua Domitia project to cross the River Thongue is now installed. This double 170 metre HDD crossing was drilled by Coquart & Fils, who commissioned OPTIMUM to provide geotechnical monitoring (G3 mission). As...
by admin-optimum-549 | Jun 18, 2020 | Telecoms
BIR, on behalf of Orange, has successfully pulled a DN500 HDPE tube containing 15 fibre optic lines. The technical urgency of the project arose at the end of January 2020 as the need to divert a sensitive network installed in a precarious dam became apparent. OPTIMUM...
by admin-optimum-549 | May 12, 2020 | Electricity
As part of RTE’s French-UK interconnection project, the dual trenchless crossing in Frénouville is now finished. Both 140 metre-long, 10-metre-deep, HDD crossings, passing under one of Normandy’s busiest rail routes, required precision control at every stage....
by admin-optimum-549 | Feb 5, 2020 | Electricity
Drilling 20m below the busiest railway in Normandy calls for the highest levels of vigilance and expertise. By accompanying RTE’s trenchless project in Harfleur on a daily basis and assisting drilling operations around the clock, OPTIMUM ensured the railway network...