optimum logo
  • Newsroom
  • Company
    • A strategic choice
    • Recognised trenchless experts
    • An industry reference
    • Recruitment
  • expertise
    • HDD Expertise
    • Microtunnelling expertise
    • Auger boring expertise
    • Data collection & monitoring
    • End structures and associated works
  • Services
    • Site visit
    • Feasibility studies
    • Assisting project owners
    • Assisting works contractors
    • Calculations and modelling
  • Contact
  • English
    • French
    • German
Trenchless expertise in action in southwest France : 50+ crossings completed

Trenchless expertise in action in southwest France : 50+ crossings completed

by Rachael Bower-Yekpe | May 28, 2026 | Oil & Gas

What began in 2020 as a truly ambitious project — replacing 70 km of Teréga’s gas transmission network — has now reached a defining moment: every trenchless crossing is complete.Over time, OPTIMUM moved from site analysis, feasibility studies and design engineering...
Size isn’t everything, in trenchless work

Size isn’t everything, in trenchless work

by Rachael Bower-Yekpe | Nov 27, 2025 | Electricity

OPTIMUM was alongside project manager SOBECA recently for the successful completion of trenchless works near Lille in northern France, contributing to RTE’s network renewal in the region.Some short trenchless projects can be just as challenging as longer ones. This...
Strengthening the water network in northern France

Strengthening the water network in northern France

by Rachael Bower-Yekpe | Aug 18, 2025 | Water

Fewer cars on the road during the summer months – but the work doesn’t stop ! OPTIMUM engineers were alongside SADE on the main road between Lille and Tourcoing for the completion last week of an auger boring crossing beneath the tramway lines. This DN 1000...
Drilling through the walls of a microtunnel ? Really ?

Drilling through the walls of a microtunnel ? Really ?

by Rachael Bower-Yekpe | Jun 19, 2025 | Water

In streets south of Paris, a seemingly ordinary underground construction site. And yet, every day, engineers stopped by to see quite a unique drilling operation … When renovating the wastewater network in L’Haÿ-les-Roses, one question had project managers...
Ever see a site that just seems too busy for a crossing (or two) ?

Ever see a site that just seems too busy for a crossing (or two) ?

by Rachael Bower-Yekpe | Jun 10, 2025 | Electricity

Two parallel trenchless crossings, passing under the T7 tramway, were completed last week just north of Paris’ Orly airport. Though they weren’t the longest, they weren’t the simplest either ! With a busy dual carriageway, one of France’s biggest shopping centres and...
« Older Entries

Articles récents

  • Navigating Chalk, Silt, and Steel: HDD canal crossing
  • Double microtunnel : Engineering beyond the obvious
  • François Gandard named FSTT workshop lead
  • Trenchless expertise in action in southwest France : 50+ crossings completed
  • Roubaix Nord : A project made for trenchless engineering

Commentaires récents

No comments to show.
optimum logo

Immeuble Ottawa
Parc du Saint-Laurent
54 route de Sartrouville
78230 Le Pecq
France

+33 1 39 21 88 68

Trenchless expertise

HDD expertise

Microtunneling expertise

Auger boring exoertise

Services

Feasibility studies

Assisting project owners

Assisting works contractors

Calculations and modelling

Company

Contact us

Recruitment




Legal notice and confidentiality policy |  Cookies