by admin-optimum-549 | Apr 22, 2021 | Corporate
Investing in trenchless expertise at the bidding stage not only demonstrates a contractor’s commitment to and understanding of a project, but also significantly increases the likelihood of winning the tender. OPTIMUM engineers help drilling / tunnelling contractors...
by admin-optimum-549 | Mar 3, 2021 | Corporate
The 2021 NASTT No-Dig Show was a bit different. What remained unchanged was the breadth and quality of knowledge sharing. OPTIMUM engineers were present remotely this year, accessing over 150 conferences on topics as varied as : • the design challenges in curved...
by admin-optimum-549 | Jul 22, 2020 | Corporate
In just 30 months, OPTIMUM has conceived over 250 trenchless projects, examining and supervising 51 000 linear metres of crossings as well as 15 km of landfalls. Its growing team of specialist engineers reinforces the pertinence of each assignment by optimising...
by admin-optimum-549 | Dec 20, 2019 | Corporate
Contracting authorities are increasingly aware of the importance of geotechnical issues in trenchless projects, leading to an more G3 missions. As such, OPTIMUM is expanding its offer to assist drilling contractors in controlling geotechnical risks and identifying...
by admin-optimum-549 | Nov 5, 2019 | Corporate
This week OPTIMUM will finalize its 30th railway crossing project. These must not only integrate a “classic” trenchless study but also adhere to the strict SNCF criteria necessary for drilling authorization. They enable the complexity and the multiple risks inherent...