The dual gas pipeline crossing of the Dordogne at Cubzac is complete. By reworking the project engineering and assisting technical operations on a daily basis, OPTIMUM managed to halve both the drilling costs and the project timeframe.
We are proud to have been able to support Coquart & Fils in this great performance, now its longest ever directional drilling project (2 x 850m). Teamwork !