Accueil > All posts > Dual pipeline crossing at Cubzac

Dual pipeline crossing at Cubzac

11 Oct 2019 | Oil & Gas

The dual gas pipeline crossing of the Dordogne at Cubzac is complete. By reworking the project engineering and assisting technical operations on a daily basis, OPTIMUM managed to halve both the drilling costs and the project timeframe.

We are proud to have been able to support Coquart & Fils in this great performance, now its longest ever directional drilling project (2 x 850m). Teamwork !

Learn more …

Our projects in the oil & gas sector

Horizontal Directional Drilling (HDD)

Horizontal Directional Drilling (HDD) offers the advantage of being quick to implement and cost-effective.

OPTIMUM services

Expertise and experience for all trenchless projects