Avoiding breakouts is one of the biggest challenges in HDD work, especially in rural and protected environments. Ensuring the drill path is adapted to both the geology of the site and the pipe being installed is key.
OPTIMUM engineers model ground behaviour before works begin to minimise break out risks and to ensure drilling operations run smoothly.