by admin-optimum-549 | Apr 8, 2021 | Oil & Gas
A beautiful sunny afternoon yesterday in the Basque country: OPTIMUM was proud to see TEREGA’s DN650 gas pipeline be successfully installed under the river Saison, near Trois-Villes. OPTIMUM accompanied TEREGA throughout the drilling works in complex geological...
by admin-optimum-549 | Feb 5, 2021 | Electricity
After Saint Nazaire and Saint Brieux, Fécamp will soon be France’s third offshore wind farm. To this end, Rte is currently building a dual electric link ; an 18km maritime connection going underground for a further 43km onland. By 2023, the two 225 kV lines will...
by admin-optimum-549 | Dec 1, 2020 | Electricity
OPTIMUM’s unique trenchless calculation capacity proved invaluable on a recent HDD project for RTE under the Nantes ring road, near FC Nantes’ Beaujoire stadium. RTE wanted to reduce the drill path depth of planned HDD crossings under the ring road to limit the...
by admin-optimum-549 | Oct 22, 2020 | Oil & Gas
OPTIMUM continues to expand its international reach with its latest mission in Romania. The 1500m long horizontal curve landfall project, which used an anchored lay barge during pull-back, will connect two natural gas fields 120kms out in the Black Sea to the inland...
by admin-optimum-549 | Sep 7, 2020 | Corporate
Understanding the full scope of a trenchless project and propose relevant solutions at every step of the way; the exhaustive article published in the latest edition of Réseaux VRD underlines the intelligence of OPTIMUM’s involvement in the Dordogne river crossing....