OPTIMUM in full force at JT Marseille

OPTIMUM in full force at JT Marseille

Great to meet a wide variety of players from the energy and utility industry in Marseille on Tuesday for the FSTT’s technical day (“Les Journées Techniques”). OPTIMUM’s specialist engineers welcomed project owners as well as drilling / tunnelling contractors from all...
Triple HDD river crossing in southern France

Triple HDD river crossing in southern France

Alongside SUBTERRA recently for the successful completion of 3 parallel 360-metre-long HDD crossings under the Gave de Pau river in southern France: a DN250 for Teréga, a DN80 and a DN50 for Arkema. Up until now, the network crossed the river via a dedicated pipe...
NeuConnect landfall works complete

NeuConnect landfall works complete

Alongside HDI this month for the successful completion of landfall works for the NeuConnect interconnector project. Once connected, this will create the first ever direct power link between Germany and the United Kingdom. Drilling through essentially silty clay soils,...