by admin-optimum-549 | Oct 30, 2023 | Electricity
Alongside HDI this month for the successful completion of landfall works for the NeuConnect interconnector project. Once connected, this will create the first ever direct power link between Germany and the United Kingdom. Drilling through essentially silty clay soils,...
by admin-optimum-549 | Oct 19, 2023 | Electricity
No trenchless crossing is too small to benefit from the expertise of specialist engineers. Further proof of that just a few days ago as INEO’s 123-metre-long HDD was successfully completed on the French Atlantic coast, a crucial step in the connection of the Yeu...
by admin-optimum-549 | Oct 9, 2023 | Corporate
Great to be in Leipzig last week for another successful DCA Congress, where the theme was “The importance of HDD in energy transition”. Trenchless engineers, drilling contractors and suppliers from around Europe once again came together to discuss current and future...
by admin-optimum-549 | Jun 29, 2023 | Water
Alongside SUBTERRA this month for the successful HDD installation of a 206-metre-long DN355 water pipe in Preignan, near Toulouse, in southern France, as part of the pipeline renovation programme being carried out to secure the Gers region’s water installation and...
by admin-optimum-549 | Apr 27, 2023 | Electricity
Round the clock dedication accompanying HDI on the Mediterranean coast for Friday’s successful installation of an 860-metre-long HDPE pipe for RTE’s EOLMED offshore wind turbine project. The DN400 HDD landfall will connect 3 floating turbines some 24km off the coast...