optimum logo
  • Newsroom
  • Company
    • A strategic choice
    • Recognised trenchless experts
    • An industry reference
    • Recruitment
  • Trenchless Technology
    • Trenchless techniques
    • Data collection & monitoring
    • End structures and associated works
  • Services
    • Site visit
    • Feasibility studies
    • Assisting project owners
    • Assisting works contractors
    • Calculations and modelling
  • Contact
  • English
    • French
    • German
Precision microtunnel engineering : No room for approximation when networks run this close

Precision microtunnel engineering : No room for approximation when networks run this close

by Rachael Bower-Yekpe | Mar 2, 2026 | Water

After 17 days of meticulous tunnelling — passing just 66 cm beneath two major wastewater pipes — a 1,730 mm (external) / 1,400 mm (internal) diameter microtunnel in Port-Jérôme-sur-Seine (near Le Havre) is now complete. The 159‑metre-long microtunnel will double...
From standstill to success: HDD turnaround in 5 weeks !

From standstill to success: HDD turnaround in 5 weeks !

by Rachael Bower-Yekpe | Feb 5, 2026 | Electricity

To complete the connection to Endesa’s solar power plant in Puertollano, southern Spain, only one task remained: a 200-metre-long trenchless crossing under the Madrid-Seville high-speed railway line and the adjacent Ciudad Real-Puertollano-Badajoz railway. However,...
One entry pit, two S-shaped HDDs, a multitude of obstacles

One entry pit, two S-shaped HDDs, a multitude of obstacles

by Rachael Bower-Yekpe | Dec 18, 2025 | Electricity

Trenchless works are now complete on another key RTE project: a network extension to supply France’s first supercomputer hosting centre, created to meet the rising demands of businesses in big data, artificial intelligence, and digital simulation. Located just south...
1300m microtunnelling safeguards strategic gas supply

1300m microtunnelling safeguards strategic gas supply

by Rachael Bower-Yekpe | Dec 11, 2025 | Oil & Gas

OPTIMUM is proud to have accompanied NaTran throughout the trenchless works — a combined 1300m across two microtunnel crossings — successfully completed yesterday near Aix-en-Provence in southern France.Installed at more than 25m deep, this crossing will ensure the...
Size isn’t everything, in trenchless work

Size isn’t everything, in trenchless work

by Rachael Bower-Yekpe | Nov 27, 2025 | Electricity

OPTIMUM was alongside project manager SOBECA recently for the successful completion of trenchless works near Lille in northern France, contributing to RTE’s network renewal in the region.Some short trenchless projects can be just as challenging as longer ones. This...
« Older Entries

Articles récents

  • Precision microtunnel engineering : No room for approximation when networks run this close
  • From standstill to success: HDD turnaround in 5 weeks !
  • One entry pit, two S-shaped HDDs, a multitude of obstacles
  • 1300m microtunnelling safeguards strategic gas supply
  • Size isn’t everything, in trenchless work

Commentaires récents

No comments to show.
optimum logo

Immeuble Ottawa
Parc du Saint-Laurent
54 route de Sartrouville
78230 Le Pecq
France

+33 1 39 21 88 68

Trenchless technology

Auger boring

Horizontal Directional Drilling

Direct Pipe®

Microtunnelling

Tunnelling

Services

Site visits

Feasibility studies

Assisting project owners

Assisting works contractors

Calculations and modelling

Company

Contact us

Recruitment




Legal notice and confidentiality policy |  Cookies