HDD pipeline installation in Chilean desert

HDD pipeline installation in Chilean desert

Proud to have played a part in the successful completion of an impressive HDD crossing in the north Chilean desert last week to install a 945-metre-long, DN 1200 pipe under the Loa River. Drilled by TECHINT, supported onsite by BM Drilling, the HDD lies 32 metres...