optimum logo
  • Newsroom
  • Company
    • A strategic choice
    • Recognised trenchless experts
    • An industry reference
    • Recruitment
  • Trenchless Technology
    • Trenchless techniques
    • Data collection & monitoring
    • End structures and associated works
  • Services
    • Site visit
    • Feasibility studies
    • Assisting project owners
    • Assisting works contractors
    • Calculations and modelling
  • Contact
  • English
    • French
HDD in Calais, France: there is ALWAYS a solution !

HDD in Calais, France: there is ALWAYS a solution !

by admin-optimum-549 | Oct 24, 2024 | Water

Local authority Communauté d’Agglomération Grand Calais Terres & Mers is at last able to complete the missing link in the renewal of its wastewater network. The project had been on hold for several years until OPTIMUM were contacted to find a solution. The issue...
Can just one core drill really make a difference ? Yes !!!

Can just one core drill really make a difference ? Yes !!!

by admin-optimum-549 | Oct 3, 2024 | Electricity

Crossing just 40 metres under SNCF rails in Montvicq (Auvergne-Rhône-Alpes) was the missing link in a 20 km project to enable RTE to connect an industrial client in central France to its network. Following initial feasibility studies, OPTIMUM advised that an...
Tarn-et-Garonne : 3 HDDs complete, 3 more to go !

Tarn-et-Garonne : 3 HDDs complete, 3 more to go !

by admin-optimum-549 | Sep 19, 2024 | Oil & Gas

Teréga continues to reinforce its gas transport network in south-eastern France and OPTIMUM trenchless engineers continue to accompany the project owner at every step. The latest project, near Montauban (Tarn-et-Garonne), will add some 23km to the network, so crossing...
Microtunnel under France’s busiest transport links

Microtunnel under France’s busiest transport links

by admin-optimum-549 | Sep 5, 2024 | Electricity

Completion this week of an important phase of RTE’s Envision project with the successful installation of a 130-metre-long microtunnel near Arras in northern France. Within the framework of the project owner’s network extension, the DN1200 microtunnel now passes under...
HDD works in a saturated underground environment

HDD works in a saturated underground environment

by admin-optimum-549 | Jul 18, 2024 | Telecoms

When energy and utility networks have to be moved ahead of the construction of an urban metro line, finding space underground is definitely not easy. This was the scenario OPTIMUM engineers were faced with in 2023 when BIR commissioned the trenchless specialists to...
« Older Entries
Next Entries »

Articles récents

  • Drilling through the walls of a microtunnel ? Really ?
  • Ever see a site that just seems too busy for a crossing (or two) ?
  • Auger boring under railway tracks in Normandy
  • Celtic Interconnector: All trenchless works finished !
  • Tarn-et-Garonne : Mission complete !!!

Commentaires récents

No comments to show.
optimum logo

Immeuble Ottawa
Parc du Saint-Laurent
54 route de Sartrouville
78230 Le Pecq
France

+33 1 39 21 88 68

Trenchless technology

Auger boring

Horizontal Directional Drilling

Direct Pipe®

Microtunnelling

Tunnelling

Services

Site visits

Feasibility studies

Assisting project owners

Assisting works contractors

Calculations and modelling

Company

Contact us

Recruitment




Legal notice and confidentiality policy |  Cookies