by admin-optimum-549 | Jun 2, 2022 | Electricity
Great to be part of another big renewables project, accompanying EDF Renouvelables during the successful installation of the HDPE duct bundle for the Provence Grand Large offshore wind turbine pilot project. The 743-metre-long HDD landfall will ultimately connect 3...
by admin-optimum-549 | May 12, 2022 | Corporate
Big congratulations to Ovale & Sens who won the French adapted rugby championship this weekend in Grenoble, with a hard fought 10 – 9 win in Sunday’s final. This latest victory comes after the club was crowned Ile-de-France champions in March. OPTIMUM is proud to...
by admin-optimum-549 | Apr 14, 2022 | Corporate
Urban microtunnel projects must ensure that works have minimal impact on both the environment and nearby infrastructure. The importance of determining the fluid injection pressures the ground can withstand is increasingly being recognised by both project owners and...
by admin-optimum-549 | Mar 17, 2022 | Corporate
Great to have accompanied RTE recently on pre-tender site visits in Le Coudray and Romainville. Indeed, visiting a site with the project owner and potential drilling / tunnelling contractors often significantly increases the quality of submissions. OPTIMUM’s...
by admin-optimum-549 | Feb 17, 2022 | Corporate
Just days after its 4-year anniversary, OPTIMUM celebrates the completion of its 500th trenchless project this week, having designed and supervised over 75 000 linear metres of drilling/tunnelling, including 10 km of microtunnel, 20 km of landfalls and 50 crossings...