Trenchless technology in the water sector

Trenchless technology in the water sector

The lack of rain in much of Europe this summer left no one in any doubt of our collective dependence on water. Weather conditions continue to focus attention on the importance of optimising water networks, whether it be for drinking water, rainwater or sanitation....
Mont – Ogenne pipeline project

Mont – Ogenne pipeline project

Great to have accompanied Teréga during the extensive Mont – Ogenne project in southwest France, a key step of which was completed a few days ago thanks to great teamwork and some pretty impressive equipment ! • – Two parallel 500-metre-long HDD crossings, DN650...
Supporting project owners at every step

Supporting project owners at every step

• Persan : Six 175m – 200m long HDD crossings under rivers and the A16 Paris – Calais motorway• Noyales : Four 90m – 120m long HDD crossings under rivers and roads in arable / pasture land• Romainville : Six 85m – 110m long HDD crossings in a heavily built-up...
International expansion

International expansion

OPTIMUM continues to expand its international reach with new projects in Asia, Africa and South America. Following on from the conception of 2 outfall projects off the coast of Sri Lanka, engineers recently completed the geotechnical analysis and modelling for a...
OPTIMUM solution for ENEDIS

OPTIMUM solution for ENEDIS

Proud to have made it possible this week for ENEDIS to complete the missing link in reinforcing the electricity supply in Deauville, northern France. The project had been blocked for several years until OPTIMUM were called upon to solve the problem less than 12 months...